Assembly requirements for the installation of PREFA flood protection

A load-bearing substrate

The system requires a load-bearing assembly substrate such as concrete or brick and should be checked in advance by a structural engineer if necessary. This applies in particular during assembly work on existing full thermal insulation or on a prefabricated house, for example in timber-frame construction.